See below.
Re; Fisher Paykal Kitchen Range,
The 2 person delivery team satisfactorily completed the removal of the existing range and completed delivery of the new range as per their prearranged schedule and positioned the new range in the counter cut out space as best they could.
The new range needs to be moved back into the counter about another 1/2 inch into its final position. To accomplish this final positioning, a "cut out" into the back wall to accommodate storage of the surplus power cable of the range needs to be completed. The range power duplex outlet may also have to be repositioned an inch or so back into the wall.
Three tasks for completing the permanent installation of the new range remain. These tasks are;
1. Range power cable repositioning and duplex repositioning.
2. Install the tilt prevention device.
3. Install the four stainless steel covers over the range feet.
Could you recommend/provide the name and contact information for a reliable FP range installer to complete these remaining installation tasks?
Thank you.
Regards,
Lee Nichols (403 888-96230)
comments