Dedicated and Hard Working
A new line was installed from our meter to the house. Directional drilling had its starts and stops several times because of the rocky soil. With all the problems, it took three days to complete the instillation from the first call. Their first objective was to get us temporary water. That took some doing. Brad and Tony had to go to "plan B" or maybe it was "plan C" for the temp line. These two guys worked well into the night to get us temporary water the second day. Within 20 feet of being complete with the drilling, the rig lost it's sonar transmitter. The remaining 20 ft was drilled blindly and they came to within a foot of where they should be. These two are very skillful and take pride in what they are doing.